Ongoing Projects In Qatar
Qatar
(1) Project :CCWP-II [ Common Cooling Seawater Project Phase II ]
Site : Ras laffan, Qatar Client : M/s. Dodsal Engineering & Construction PTE Ltd. Owner : Qatar Petroleum. Scope of work :Construction of Pipe sleepers , Pipe Bridges, Anchors and Control Buildings Job Card : J141 Effective date : 31 march 2007 Contract Duration : 24 months Overall Completion : 30th March 2009 Description Pipe sleepers: Size of pipe sleeper : 4.2m X 13.67m X 1.8m(Average size) Total Nos. : 886 Nos. Excavation 5.2m X 14.67m X 1.6 m, Excavation, Sub base preparation, Compaction and testing, Blinding, Water proofing, Rebar fixing, Shuttering, Concrete placing including Fixing of Anchor Bolts and base plates, backfilling with compaction test (Layer by Layer 150 ֠200 mm thick) Pipe sleepers with Saddle: Size of pipe sleeper : 4.2m X 13.67m X 1.8m(Average size) Total Nos. : 210 Nos. Excavation 5.2m X 14.67m X 1.6 m, Excavation, Sub base preparation, Compaction and testing, Blinding, Water proofing, Rebar fixing, Shuttering, Concrete placing including Fixing of Anchor Bolts and base plates, backfilling with compaction test (Layer by Layer 150 ֜r 200mm thick ) Pipe bridges: Types : PB 01, PB02, PB 04, PB 05, PB06 No of pipe bridges :15 Nos. Detail for one Pipe Bridges Raft size :17.4m X17.4m X 1.6m Columns :1.5m X 1.5 m X 6.2m - 10 Nos. 1.2m X 1.2m x 6.2 m - 10 Nos. Beams : 1.5m X 1.5m ( For intermediate and Top level) 1.2m X 1.2 m ( For intermediate and Top level) Excavation 18.4m X 18.4m X1.8m (Average) Excavation, Sub Base preparation of Excavated area, Compaction and testing, Blinding, Water proofing, Rebar fixing, Shuttering (Steel & Wood), Concrete placing including Fixing of Anchor Bolts and base plates, backfilling with compaction test (Layer by Layer 150 ֠200 mm thick ) Anchors: Types : 2963PS, 1018 PS, 5211PS,5286PS, 2963PT, 1018 PT, 5211PT,5286PT No of anchors : 8 Nos. Size of one Anchor : 22mX 18mX7.4m Raft size : 22mX18mX3.2m Wall :22mX18mX4.2m[ 3 Nos. of 3.25 m pipe passes through the wall] Excavation 24m X 20m X3.8m (Average) sub base preparation of excavated area, Compaction and testing, Blinding, Water proofing, Rebar fixing, Shuttering, Concrete placing including fixing of anchor bolts & base plate fixing.![]()
![]()
![]()
![]()
(2) Project : Construction of Building (G+1) at Ras Laffan, Qatar
Client : M/s. Dodsal Engineering & Construction PTE Ltd. Scope of Work : Construction of Buildings ֠5 Nos. Job Card : J142 • Ras gas LLCC Building [G+1] • Qatar gas LLCC Building [G+1] • Outfall LLCC Building [G+1] • Receiving Basin LLCC Building [G+1] • MOV LLCC Building [G+1] Description Excavation, Backfilling, Water Proofing, Scaffolding, Sub Structure, Super Structure, Finishing & Special Finishing like Dust Proof Painting, Raised flooring, Anti Acid Flooring,Fire rated doors, Fire hydrant, Mineral fiber false ceiling.![]()
![]()
![]()
![]()
(3) Project : Construction of New school for Mohd. Al Ajjaj kubaisi at west bay ֠Doha Qatar
Client : Al Ajajj Trading and Contracting Co. W.L.L Consultant : CICO Consulting & Architects & Engineers Concrete : 11694 cum Shuttering : 49867 sq. mt. Rebar : 1403 tons![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
(4) Project : Construction of Villas ( G+1) - 2 Nos.
Client : Al Ajajj Trading and Contracting Co. W.L.L Consultant : Al-Aqsa Engineering Consultancy![]()
![]()
(5) Project: Tank Foundation for Common low Sulphur Condensate Storage facilities at Ras Laffan
Industrial City
Client : Dolphin EnergyLimited Contractor : Qatar Constructions Co. W.L.L. No. of Tanks : 1 Tank ( 85 dia. )![]()
![]()
![]()
![]()
(6) Project : Civil works for Common Volatile Organic Compound destruction facilities for Liquid Product jetties
Client : Qatar Gas Scope of Work: Civil Package at existing Lee Breakwater in live berth area • Construction of Sub Stations • Construction of buildings • Construction of skid foundation • Construction of foundation of blower • Pipe rack foundations • Roads and other general civil works inside the Common Combustor area
(7) Project : Construction of Mezanine floor at landmark Qatar
Client : Centre Point Contractor : Rawath Construction Scope of Work : Live running area modification Design, fabrication and erection of steel structure with concrete decking.![]()
![]()
![]()
![]()
(8) Project: Construction of Sub Station (B+G+2 ) for Melamine Project @ Me Saeed Industrial Area, Qatar.
Client : Qatar Fertiliser Company Contractor : Qatar Engineering And Construction Co. W.L.L. Build up Area : 3000 Sqm. Plinth Area : 740 Sqm.
(9) Project: Construction of Security Complex at Old Rayyan, Qata.
Client : Ministry of Interior, Qatar. Contractor : United Arab Construction Co. W.L.L., Doha, Qatar. Consultant : Sketch Engineering Consultant Office. Plot Area : 28000 Sqm. Build up Area : 17000 Sqm.![]()
![]()
![]()
![]()
List of On Going Projects
|
S/N |
Client |
Contractor |
Location |
Project Description |
|
1 |
Ministry of Interiors |
Arcon |
Rayyan |
Construction of Rayyan Security Complex - old Rayyan |
|
2 |
New Line |
Newline |
Umsalal |
Construction of Aerobic Digester and SAS balancing tank at Doha North Sewerage Treatment works |
|
3 |
H.E.Mohammed Ajjaj Al Kubaisi |
Ajjaj |
West Bay |
Construction New school building at West Bay and 3 villas (G+1) at AZGUA For H.E.MOHAMMED AJJAS AL KUBASIS |
|
4 |
New Line |
Newline |
Umsalal |
Construction of Aerobic Digester and SAS balancing tank at Doha North Sewage Treatment works |
|
5 |
Q con |
Q con |
Rasallafan |
Up gradation of LNG Berth |
|
6 |
Keppel Seghers Engineering Singapore PTE LTD |
Aqua - Terra Middle East |
Doha North |
Construction of Cavity Wall & Plastering |
|
7 |
Aspire Logistics |
Protect |
Doha |
Relocation of Asian Games Cauldron |